| Project Extranet Survey |
Sarcophagus is conducting a survey to quantify uptake of collaboration extranets. Your comments are very valuable to us. Please click here to assist.
 |
|
Clients' Testimonials
 |
Catherine DoigDesign & Build Coordinator, Birse Stadia Limited |
| |
"Birse chose the-project.co.uk for the Kingston upon Hull Community Stadium and Sports Complex because it is user friendly, has the ability to be flexible and is value for money." |
 |
Graham DaveyQuantity Surveyor - Associate Partner and IT Manager, Christopher Smith Associates |
| |
"Sarcophagus strikes the right balance between ease of use, functionality, convenience and speed with virtually no need for training." |
 |
Alex WallPartner,W.C.E.C Architects - www.wcec.co.uk |
| |
"I believe that the use of project extranets for development will revolutionise the way in which construction professionals work.
Project extranets provide the opportunity for greater speed and efficiency in the management and co-ordination of design, procurement and construction information.
Of the project extranets which I have seen "the-project" is one of the quickest, most reliable, and easiest to use. It is a system which I can recommend to my clients with confidence." |
 |
Julian DonaldContracts Manager, Renaissance |
| |
"I have been running the-project for a month now and would like to say how pleased I am with the system. It is both simple to use and reliable and the project team are finding it useful. It has already added value to the project as people are reading documents that they would not normally see and spotting errors and areas for improvement. The drainage consultant noticed that a path specified in the design brief was missing saving time and expense in the future, in short collaboration is improved." |
 |
David OlivantCommercial Procurement Manager, ASDA - www.asda.co.uk |
| |
"ASDA have been using extranet collaboration systems for over 5 years and it is now the only way of working on our construction sites. The system provides ASDA and its construction teams with fast access to all information on a single unified platform. It pulls together all the strands of the construction process and teams, from client, design team, through to the Contractor and his supply base on one communication platform. Extranets are so deeply imbedded in to our system and culture it is impossible to think of working without it." |
 |
Mike O’ConnellStadium Developments Ltd |
| |
"Stadium Developments have been using a project collaborative extranet since 2001 and it has become our preferred method of working. The system provides us with greater management control over our projects and the ability to produce Building Manuals and Health and Safety files more efficiently at the end of a project. It has significantly reduced our paper storage requirements and improved project information retrieval. We have retrospectively scanned old projects and published it to the extranet as an online archive." |
|